Witikonerstrasse, Zürich

2019

In the quiet Witikon neighborhood, the PWG Foundation had 38 new apartments built, which will be ready for occupancy in summer 2020. These affordable apartments are sought after in the rather more expensive neighborhood of the city of Zurich.

Facts and images
Construction Data
Involved
Balcony
Balcony
Exterior view
Exterior view
Connection parapet terrace to outer wall
Connection parapet terrace to outer wall

The project
In Zurich's Witikon district, 2 apartment buildings with 38 apartments were built. The majority of the family apartments have 4.5 or 5.5 rooms. The simply developed apartments all have a balcony or a terrace. With the direct bus connection to the city center, Witikon has moved closer to the city center and should therefore become more attractive again for younger people. The property is located on the outskirts of the city in the immediate vicinity of woods and meadows and is nevertheless very close to the district center.

The construction
The two apartment buildings on Witikonerstrasse were constructed as a classic hybrid building with load-bearing concrete ceilings and non-load-bearing exterior walls in timber frame construction. Vertical inverted formwork in spruce/fir was used as the façade cladding. Timbatec planned and supervised the facade design including fire protection and quality assurance (QSS). The vertical partitioning of the rear ventilation was created with floor-by-floor steel aprons.

The challenge
For the construction approval of the combustible facade, discussions with the fire department and fire police had to take place at an early stage. This meant that the fire department's access routes and intervention options could be planned into the project at a very early stage and implemented in the end. Thanks to this early clarification, the project was approved without any problems, since everyone involved was already aware of it.

Construction Data

- Inverted formwork 2'250 m2

- Structural timber 170 m3

- Wood-based panels 4'000 m2


Services of Timbatec

- SIA Phase 53 Commissioning

- Statics and construction

- Fire protection planning

- Fire protection Quality assurance QSS2

- Cost estimation

- Technical site supervision and site inspections

Architect
Baumberger & Stegmeier AG, 8004 Zurich


Client
PWG Foundation, 3036 Zurich


Timberconstruction engineer
Timbatec Holzbauingenieure Schweiz AG,8005 Zurich


Timber construction
Blättler Holzbau GmbH, 9556 Affeltrangen


Civil engineer
ewp AG, 8307 Effretikon


Building physics
BAKUS Bauphysik, 8045 Zurich


Construction management
Baumberger & Stegmeier AG, 8004 Zurich


Photography
zimmermannfotografie, 8038 Zurich