Construction Data
Involved
Articles
South facade with solar panels
South facade with solar panels
Visualization north-east
Visualization north-east
Wooden element roof with photovoltaic system for electricity generation
Wooden element roof with photovoltaic system for electricity generation
Ground plan ground floor, 1st floor 1ST FLOOR, 2ND FLOOR
Ground plan ground floor, 1st floor 1ST FLOOR, 2ND FLOOR
Cross section
Cross section

The project
The structure The basic structure is kept very compact and thus also very energy efficient. Under the gable roof are a total of 7 apartments. Behind the wooden element facade is a massive concrete skeleton building, which serves as a mass storage.in the interior, exposed concrete, clay plaster and oak parquet dominate.

The construction
The execution The whole building is the 1st PlusEnergy MFH in Switzerland. Plusenergy means that this building produces more energy than its inhabitants and the building itself consume. Thermal energy is obtained through the south facade, which consists of solar collectors. A 24'000 l storage tank in the basement serves as heat storage. Passive solar energy is used through the large windows facing south. The electrical energy is generated by the full-surface photovoltaic system on the south-facing gable roof and on the pavilion roof. Through the use of natural, preferably untreated building materials, the ECO label is also achieved in addition to Minergie-P. This PlusEnergieBau won a solar prize in 2009 and 2010.

Construction Data

- Wooden element thickness 58 cm

- Thermal insulation cellulose/rock wool 48 cm

- Hot water tank 24'000 liters

- Photovoltaic system 33'000 W


Services of Timbatec

- SIA Phase 31 Preliminary design

- SIA Phase 32 Construction project

- SIA Phase 41 Tendering and comparison of offers

- Site supervision and site inspections

Photo voltaic system
3S Swiss Solar System
3250 Lyss


Timber construction
Dettling Holzbau AG
6440 Brunnen


Architect
Grab Architekten AG
8852 Altendorf


Solar system
Heizplan AG
9473 Gams


Building owner
Sanjo Immobilien AG
8852 Altendorf






Datenschutzhinweis

Diese Webseite nutzt externe Komponenten welche dazu genutzt werden können, Daten über Ihr Verhalten zu sammeln.

Notwendige Cookies werden immer geladen