Reconstruction school building Vogelbuch, Rizenbach

1998

According to the architects' plans, the Vogelbuch school building was to be extended by one classroom length. In addition, the entrance area, break hall and group room were redesigned.

Facts and images
Construction Data
Involved
Bright rooms
Bright rooms
Large windows
Large windows
Type
Type
Windows
Windows
Input
Input

The project
The break hall placed special demands on the engineer.

The construction method
Due to the specification that no joist should be visible, it was integrated into the structure. The load-bearing elements are box girders made of three-layer panels and glulam ribs. The group room extension was built as a timber element construction.

Construction Data

- Glulam B 11 m3

- Sawn timber 8 m3


TimberConstruction Engineers
Timbatec Holzbauingenieure Schweiz AG, Thun
3600 Thun


Timberconstruction
Stalder Söhne AG
3225 Müntschemier


Civil engineer steel construction
Weber, Angehrn, Meier, Ingenieure
3000 Bern


Architect
Bauart Architekten
3000 Bern


Client
Ferenbalm municipal administration
3206 Rizenbach



Datenschutzhinweis

Diese Webseite nutzt externe Komponenten welche dazu genutzt werden können, Daten über Ihr Verhalten zu sammeln.

Notwendige Cookies werden immer geladen