The project
The valley-side warehouse, production and sales building was planned as a single-story skeleton structure. So that the various uses could be covered with a uniform load-bearing system, a load-bearing system was chosen as follows.
The construction method
Simple columns and single, partly double main beams in the transverse direction - rafter purlins above. The administration building was constructed as a timber frame building with visible board stack ceilings. The walls also partly consist of internally visible board stacks. Ventilated formwork was mounted on top.
Construction Data
- Administration building
- 9 x 52 m
- 2 floors
- upper floor in timber construction
- floor area 460 m2
-
- warehouse and production building
- 10 x 70 m
- Height 5.3 m
- Total wood: 100 m3
- Floor plan area 700 m2
Timber constructioncontractors
Hector Egger Holzbau AG
4900 Langenthal
Timber construction engineers
Timbatec Holzbauingenieure Schweiz AG, Thun
3600 Thun
Client
Burgergemeinde
3989 Biel
Architect
Bauzeit Architekten GmbH
2502 Biel
Structuralanalysis
Ingenieure & Planer AG
2502 Biel
Civil engineer
Riederer & Partner GmbH
3047 Bremgarten