The project
The existing building was completely renovated and at the same time one floor was added. While the existing building is made of reinforced concrete, the extension was realized in a lightweight timber construction.
The construction
In the case of the addition in wood, the exterior walls are made of a stud wall. On the outside, the stud wall is provided with external thermal insulation and finished with an abrasion. The roof is formed by hollow box elements that support the flat roof structure.
The challenge
The exterior walls should be as slender as possible. The load transfer points are very punctual over the whole extension, due to the existing building.
Construction Data
- Three-layer glulam 36 m3
- Glued laminated timber 44 m3
- gypsum fiberboards 28 m3
- Frame construction scantlings 33 m3
- OSB 3 m3
Services of Timbatec
- SIA Phase 31 Preliminary design
- SIA Phase 32 Construction project
- SIA Phase 41 Tendering and comparison of offers
- SIA Phase 51 Implementation project
- SIA Phase 52 Execution
- Statics and construction
Owner
Zurich Investment Foundation
8045 Zurich
Client
CORTI Total Services AG
8406 Winterthur
Architect
Dachtler Partner AG
8036 Zurich
Timber construction engineer
Timbatec Holzbauingenieure (Schweiz) AG Zurich
8005 Zurich
Civil Engineer
Basler & Hofmann AG
8032 Zurich
GU/TU, construction management, photography
CORTI Total Services AG
8406 Winterthur
Building physics
Wichser Akustik & Bauphysik AG