The project
The infrastructure of the outdoor spaces at the GZ Bachwiesen was questioned due to the increasing requirements for work safety, animal husbandry and general use. As the stable buildings were already getting on in years and had become somewhat slanted, they were checked for their substance. Due to the additional requirements, it quickly became clear that the stables no longer met the requirements and should be replaced. This also allowed the outdoor space to be designed more freely.
The construction
The flat-founded replacement buildings were built using timber frame construction. During construction, particular attention was paid to animal-friendly design, so that mites and other unwanted visitors were prevented from nesting as far as possible.
The challenge
Construction time had to be kept to a minimum so that the animals only had to spend a short time in their vacation home. This meant that care and other activities at GZ Bachwiesen could be ramped up again as soon as possible.
Construction Data
- Gross floor area: 430 m2
- structural timber C24: 45 m3
- Glulam: 3.5 m3
- DSP: 8 m3 Larch cladding
Services of Timbatec
- SIA phase 21 structural review
- SIA Phase 31 Preliminary design
- SIA Phase 32 Construction project
- SIA Phase 41 Tendering and comparison of offers
- SIA Phase 51 Implementation project
- SIA Phase 52 Execution
- SIA Phase 53 Commissioning
- Structural analysis and design
- Cost estimate
Client
Grün Stadt Zürich
8001 Zürich
Architect
L3P Architekten ETH FH SIA AG
8158 Regensberg
Timberconstruction engineer
Timbatec Holzbauingenieure Schweiz AG
8005 Zurich
Timberconstruction
Erni Holzbau AG
6288 Schongau
Civil Engineer
Timbatec Holzbauingenieure Schweiz AG
8005 Zurich
vetschpartner Landscape Architects AG
8001 Zurich