Construction Data
Involved
Roof incision with a view of the Thurgau landscape
Roof incision with a view of the Thurgau landscape
Attention to detail: well thought out down to the smallest corner
Attention to detail: well thought out down to the smallest corner
An old barn is given a new lease of life
An old barn is given a new lease of life
No steel parts: Detailed solution with beech nails
No steel parts: Detailed solution with beech nails
A cozy atmosphere thanks to wooden architecture
A cozy atmosphere thanks to wooden architecture

The project
Not far from Frauenfeld, in the small hamlet of Dingenhart, a spacious detached house has been built in the last two years. The building impresses with its combination of wood and exposed concrete. The close collaboration between architects and timber construction engineers, as well as the will and passion to plan every detail precisely, has resulted in a showcase project for modern and honest timber construction architecture.

The construction method
The building was planned and constructed as a classic timber frame structure with a solid central zone. In order to create the large and airy rooms at the two ends of the building, a grid of slender laminated beams made of Swiss beech wood was used. The roof was planned and constructed as a raftered roof with a cold screed in the style of traditional farmhouses.

The challenge
As the principle of «no cover parts and reducing the use of steel to a minimum» was the top priority in the planning from the outset, all details had to be solved with the utmost conscientiousness and creativity.

Construction costs

- BKP 1-9: 4.9 Mio. CHF

- BKP 2: 4.5 Mio. CHF

- BKP 214: 1.2 Mio. CHF (without facade)

- Facade 350'000 CHF


Services of Timbatec

- SIA Phase 31 Preliminary project

- SIA Phase 32 Construction project

- SIA Phase 41 Tendering and comparison of offers

- SIA Phase 51 Execution project

- SIA Phase 52 Execution

- Specialist planning for building physics

- Cost estimate

Architect
Bernath + Widmer Architekten AG
8048 Zurich

Timber construction engineer
Timbatec Holzbauingenieure (Schweiz) AG Zurich
8005 Zurich

Civil engineer
Dr. Deuring + Oehninger AG
8401 Winterthur

Building physics
Timbatec Holzbauingenieure (Schweiz) AG Zurich
8005 Zurich

Photography
Roland Bernath

Client
Bernath + Widmer Architekten AG
8048 Zurich


Datenschutzhinweis

Diese Webseite nutzt externe Komponenten welche dazu genutzt werden können, Daten über Ihr Verhalten zu sammeln.

Notwendige Cookies werden immer geladen