Bergheim, Tägerwilen

2016

The Bergheim residential building in Tägerwilen, Thurgau, was constructed largely in wood. Special attention had to be paid to sound insulation for the four condominiums in the new building.

Facts and images
Construction Data
Involved
Bergheim: Space for four spacious condominiums
Bergheim: Space for four spacious condominiums
During the construction work: Load-bearing exterior walls made of solid wood
During the construction work: Load-bearing exterior walls made of solid wood

The project
The Bergheim residential building in Tägerwilen, not far from Frauenfeld, is a replacement building for a single-family house that previously stood on the same site. The new four-story building on Oberdorfstrasse now contains four large 4.5-room condominiums. Each apartment occupies an entire floor and has an area of 167 m². Characteristic of the building are the spacious rooms. They are flooded with light, and the exposed wooden ceilings provide a pleasant living environment.

The construction
The basement with the integrated parking, the cellar compartments and the disposable rooms as well as the staircase were built of reinforced concrete. Everything above ground level is made of wood: For the first floor and the other floors, the exterior and interior walls as well as the floor slabs are made of solid wood. The walls are made of cross laminated timber, the ceilings are made of diagonal dowel wood.

The challenge
The client, who had a wooden building constructed for the first time with the Bergheim, placed great value on sound insulation for the four condominiums with a high standard. The high sound insulation requirements were met by weighting the ceiling with chippings. With success: the sound measurements carried out revealed very good results, and the Bergheim residents can look forward to a quiet new home.

Construction Data

- Exterior walls of cross laminated timber 600 m2

- Interior walls of cross laminated timber 830 m2

- Ceilings from diagonal dowel wood DD 670 m2


Services of Timbatec

- SIA Phase 31 Preliminary design

- SIA Phase 32 Construction project

- Statics and construction

- SIA Phase 51 Implementation project

Timber constructor
Sohm AG Switzerland
9443 Widnau


Architect
Entenmann Architektur GmbH
8597 Landschlacht


Client
Immo Harvest GmbH
8597 Landschlacht


Timberconstruction engineer
Timbatec Holzbauingenieure Schweiz AG, Bern
3012 Bern