The project
The staircase core, the apartment partition walls and the floor slab are constructed in concrete.
The load-bearing layer along the exterior walls is built in prefabricated timber construction, with individual load-bearing timber columns integrated into non-load-bearing timber frame walls. The entire attic floor was also constructed in timber.
The construction method
The non-load-bearing interior walls, on the other hand, were realized in plaster (dry construction). With this construction method, the highest possible flexibility for future changes of use was achieved.
Construction Data
- 560 m2 Facade elements
- 445 m2 Roof elements
- 14 m3 BSH columns integrated in exterior walls
Services of Timbatec
- SIA Phase 31 Preliminary design
- Fire protection planning
- cost estimate
- SIA Phase 32 Construction project
- Structural analysis and design
- SIA Phase 41 Tendering and comparison of offers
- SIA Phase 51 Implementation project
- Site supervision and site inspections
Architecture
mépp Partner Projekte AG
8004 Zurich
Civil engineer
Synaxis
8050 Zurich
Construction Management
LBM Partner Baumanagement
8152 Opfikon
Energy concept
Lemon Consult
8006 Zurich